The Torreblanca–Quatre Pilans industrial estate

On 24 March 2026 the Catalan Territorial Commission gave final approval to the Urban Master Plan for Economic Activity in the Plana de Lleida. Within an area of 1,280 ha to the south-east of the city, it plans an economic activity sector of 328.6 ha and reserves land for a freight rail terminal.

See on the map how far the plan reaches

News. The association has filed a judicial review appeal against the final approval of the plan. Read the news.

Plan
PDU for economic activity in the Plana de Lleida
File
2020/072056/L
Approval
Final, 24/03/2026 · initial, 26/07/2022
PDU area
1,280 ha
Sector
328.6 ha, a single estate
Implemented by
Institut Català del Sòl (INCASÒL)
Land
INCASÒL 65.4 % · EMU 6.6 % · private 28 %
Costs
163.600.173,30 €
Interactive map

How far the plan reaches

Planning map O.01 of the approved plan, overlaid on the orthophoto and topographic map of the Cartographic and Geological Institute of Catalonia. Zoom in to your plot, turn on the Cadastre parcels and tap each zone to find out what it is and how the land is obtained.

Master plan (map O.01)

Reference

Loading map…

How it was made: the association extracted the lines from the official PDF of map O.01 «Àmbits PDU i sector» (final approval, 24/03/2026, scale 1:10,000) and placed them on the ground by fitting the map's cartography to that of the ICGC. The resulting area of the sector, 3,286,038 m², matches that of the map (3,286,047 m²). The positional error may be a few metres: it is an aid to orientation and has no legal value. For a specific plot, consult the official map in the Catalan Urban Planning Register (file 2020/072056/L). Base map: ICGC (CC BY 4.0). Parcels: Directorate-General for the Cadastre.

Zone by zone

Who expropriates, who pays and who stays in

The plan uses two systems. Within the sector, cooperation: the authority develops the land and the owner stays within a reparcelling, receives a plot proportional to what they contributed and pays their share of the works. Outside the sector, expropriation: the authority pays fair compensation and the owner leaves. The third system, compensation, is not applied anywhere.

Map of the Torreblanca–Quatre Pilans sector with the nine zones numbered according to the implementation system
Indicative analysis by the association based on map O.01 of the PDU. The position of the numbers is approximate.
#ZoneHow the land is obtainedWho pays
1Torreblanca–Quatre Pilans sector (328.6 ha)CooperationLandowners in the sector
2Restoration of the Femosa watercourse and irrigation channelExpropriationINCASÒL; later transferred to the City Council
3Shared technical services (treatment plant)ExpropriationSame
4Wildlife crossingsExpropriationSame
5Healthy connectors (rural paths)ExpropriationSame
6Reserve for the multimodal terminalNot specified—
7Reserve for the route of the 220 kV lineNot specified—
8Access corridor from the C-13B (plots 1 to 18 in Annex VII)Cooperation it is within the sectorLandowners in the sector
9Remaining non-developable land in the areaNo action—

If you own land within the sector

Landowners hand over the land for roads and open spaces free of charge, pay for the development and transfer to INCASÒL 15 % of the developed building rights. The plan provides for the reparcelling community to take on rehousing rights.

Anyone who cannot pay their share may end up excluded from the reparcelling and compensated, according to the plan itself. This should be asked in writing, case by case.

If you own land in an expropriation area

Since the approval, current uses are non-conforming. Only the minimum works needed to keep the activity going are allowed: no improvements or extensions that could raise the future compensation.

These plots are listed in Annex VII of affected property and rights, numbered 1 to 115. Anyone listed there has the right to be notified personally.

Official plan documents · 2026
2026 regulations, article 62: the implementation system will be reparcelling under the cooperation method; acting authority, Institut Català del Sòl; transfer of 15% of the building rights
2026 regulations, direct implementation areas on non-developable land: they will be implemented through expropriation and current uses will be non-conforming; improvement works that could increase the value of the potential compensation will not be allowed
Urban planning regulations (final approval, 2026). Top, article 62, management conditions for the sector. Bottom, title II, action areas on non-developable land, points 3 and 4. Highlighting by the association.
Phases

Where it will start

The plan's economic assessment divides the development into three phases. The first includes the access from the C-13B, which must be paid for in full at the outset.

Diagram of the estate with phases 1 (42.2 ha to the west), 2 (134.9 ha to the east) and 3 (25.8 ha to the north)
Phase 1: 42.2 ha and 11 plots. Phase 2: 134.9 ha in a single plot, which cannot be activated until the terminal study is approved. Phase 3: 25.8 ha along the N-240. Source: Economic and financial assessment of the PDU, March 2026, p. 17.
The numbers

€163.6 million in sector costs

These are sector charges: all landowners pay them in proportion to their rights, INCASÒL included.

DistrictAmount
Road development61.459.320,74 €
Works on the link with the C-13B (all in the first phase)14.055.094,39 €
Compensation for buildings, activities and rehousing within the sector4.993.610,26 €
Public transport deficit2.217.466,12 €
Expropriation of land outside the sector1.507.689,54 €
Compensation for buildings and activities outside the sector199.701,97 €
Total PDU costs163.600.173,30 €

The table shows the items detailed in the association's report; the difference up to the total corresponds to the other items in the plan's economic assessment.

Official plan document · 2026
Table of land transformation costs from the economic assessment: road development €61,459,320.74; works on the C-13B link €14,055,094.39, all in phase 0-1; total costs €163,600,173.30; note: estimate pending the formalisation of the agreement between INCASÒL, the DGEIM and Cimalsa
Economic and financial assessment of the PDU (final approval, 2026), section 10, table of land transformation costs by phase. Highlighting by the association.
2022 → 2026

The approved plan is not the one put out to the public

Comparison between the initial approval document (July 2022), put out to public consultation, and the document given final approval (March 2026).

ItemPut out to the public, 2022Approved, 2026
Sectors3 on developable land and 1 on non-developable land1
Implementation systemExpropriation (261.4 ha) and cooperation (89.6 ha)Cooperation (328.6 ha)
Developable land351.1 ha328.6 ha
Intermodal centreSector of 82.7 haRemoved; temporary land reserve
Road accessC-13B and N-240C-13B only
Protection of Limonium catalaunicumUrban planning system for floral protection, 10.2 ha publicly ownedZone of areas of natural interest, without system status
Carbon offsettingArticles 131 and 138Deleted
Mobility managerArticle 134Deleted
Generated mobility34,771 trips/day, two accesses34,224 trips/day, one access

Screenshots of the original 2022 and 2026 articles are in the article «Four years to make it worse».

Limonium catalaunicum

Limonium catalaunicum is a plant listed as endangered in Catalonia (Decree 172/2008). In 2022 the plan made it a publicly owned urban planning system to guarantee its reproduction. In 2026 its land becomes a natural interest zone, which remains in private hands and only carries a regime of permitted uses.

What has not yet been decided

The multimodal terminal and the 220 kV line are land reserves without an implementation system. The reserved land does not change classification but is restricted in its uses. Red Eléctrica stated in writing that the planned substation is not in the current transmission grid planning.

The intermodal station

Threatened flora

A vulnerable species within the sector

New article: the Quatre Pilans sea lavender, with maps and documents

The Generalitat has recorded a 2.99 ha area of Limonium tournefortii within the plots of the sector. The approved plan gives no answer about this species.

Limonium tournefortii, area 16427 Plots in the sector (Annex VII)
Species
Limonium tournefortii (spermatophyte)
Catalogue
Vulnerable · Catalogue of threatened flora of Catalonia (Decree 172/2008)
Area
No. 16427 · 2.99 ha · area of presence
Presence
Confirmed, by field observation
Population
Native
Data
2024

What the documents say

  • The whole area falls on plots that the list of property and rights (Annex VII) includes within the Torreblanca–Quatre Pilans sector, on developable land.
  • The area is in the Quatre Pilans district.
  • The Generalitat's data are from 2024, two years before the final approval of the plan.
  • In the approved documents, the species only appears in the summary of a 2022 objection, which warned of its presence «principalment al sector de Quatre Pilans» [mainly in the Quatre Pilans sector].
  • The response to that objection only refers to Limonium catalaunicum. The flora analysis in the environmental study does not mention Limonium tournefortii.

Sources: Generalitat de Catalunya, public layer of Areas of faunal and floral interest (AIFF), area 16427, consulted on the Hipermapa on 27/09/2026; PDU for economic activity in the Plana de Lleida (March 2026): Annex VII, Strategic environmental study (Report, pp. 38–39), Summary document and Public participation report. Plot boundary: Cadastre geometry of plots 1 to 87 in Annex VII; it is not the exact boundary of the sector, which is 328.6 ha. District boundaries: the association's layer based on the Lleida City Council KML.

The association's position

We believe the changes between 2022 and 2026 are large enough that the plan should have been given initial approval again and put out to the public again, as provided for in article 112 of the Regulations of the Urban Planning Act. 261.4 ha that were to be expropriated now go through cooperation, and no landowner was able to object to this regime.

We are also concerned that the plan allows activities with a risk of major accidents right next to Mangraners and leaves safety distances to each company's licence, when European law requires them to be decided at the planning stage. With homes within the sector, a school 420 m away and fog episodes lasting days, this is no place for Seveso activities. We argue for a logistics and agri-food estate, linked to the rail terminal. Why we say so.

Nor does the estate provide an answer on housing for the workers who will have to come from elsewhere. Read the article «Torreblanca: who will work there, and where will they live?».

What you can do now

  1. Check whether your plot is listed in Annex VII: plots 1 to 87 within the sector and 1 to 115 in the expropriation areas. Pay attention to plots 1 to 18, the access corridor alongside the C-13B.
  2. Ask INCASÒL and the Department of Territory in writing for the list of property and rights for the external connections and when it will be notified.
  3. If you have a farmhouse or activity in an expropriation area, bear in mind the non-conforming regime before doing any works.
  4. Write to us at associacio@hortasud.org to share your case.

This page is an indicative analysis by the association based on the plan's public documents. It may contain errors and does not replace consulting the file or legal advice.

Sources: decision of the Catalan Territorial Commission of 24/03/2026 (file 2020/072056/L); Urban planning regulations, Planning report, Economic and financial assessment, Generated mobility assessment study, Annex VII and maps O.01 and O.04.b of the PDU (March 2026); initial approval documents certified by the Lleida Urban Planning Commission on 27/07/2022.